Underground Construction Difficulties Components of the Project
 
 
   During the construction, there were a number of constraints affecting the alignment of the two tunnels and the selection of the locations of ventilation stations in this  congested area. Some of the challenges were:-
 
  • passing underneath an existing main sewer tunnel, 17m below ground level in Port Said Street.
  •  
  • avoiding damage to the existing ancient buildings. Extensive surveys and monitoring of the ground level and important buildings was undertaken to prevent damage.
  •  
  • avoiding the piled foundations of an existing bridge in El Azhar Street.
  •  
  • Avoiding and diverting existing Utilities.
  •  
  • Road traffic had to be kept flowing smoothly,
  •  
      These challenges were overcome by careful planning and execution of the works. Extensive surveys were carried out to identify the foundations and the structural condition of the existing structures, close to the alignment. In some cases special grouting and micro-piles were used to stabilise the ground.
     
      Negotiations concerning these investigations and permission to conduct them, was obtained from the concerned Authorities in Cairo, such as the Cairo Governorate, the Islamic Cultural Committee, the Cairo Electricity Distribution Company, the Water and Sewage Authorities. In addition, works on the surface, for traffic diversions, involved intensive and protracted negotiations with the Cairo Traffic Authority.